Retour au blog

From prototype to production: a deployable PWA stack

Tutorial10 novembre 20241 min de lecturePar l'équipe PWASK

A practical path to production: CI, environment configs, secure auth, resilient data flows, and observability — with commands and patterns.

From prototype to production: a deployable PWA stack

Going to prod means predictable builds, secure boundaries, typed APIs, and visibility. PWASK provides the rails so your rollout is steady and reversible.

Production checklist

  • CI running lint, type-checks, tests, and Lighthouse audits.
  • Environment-driven Supabase configs (dev/staging/prod) with safe preview defaults.
  • Edge-friendly rendering and ISR for marketing pages.
  • Versioned APIs + typed SDK usage to avoid breaking deploys.

Rollout plan

  1. Prototype: Auth + core tables; mock heavy integrations.
  2. Hardening: Route guards, RLS policies, rate limiting, queued writes.
  3. Deploy: Vercel for app; Supabase migrations via CLI; monitor with Sentry/Analytics.

Tips

  • Keep migrations small and idempotent (IF NOT EXISTS, ON CONFLICT).
  • Tag releases; pin client versions across environments.
  • Use preview deployments for PR review.

Measure Core Web Vitals and error rates before promoting to production.